Tuesday, June 5, 2012

OPINION OF ONE JWM OF OFB

When there was 4 grade structure the promotions were continious. If a person appointed as CM- II, generally he retires as JWM after gaining 3 promotions. Now one CM has to satisfy with one promotion in his life time to JWM. Where as IOFS and IEs  cadre are assured with 4 or more promotions in total service
 
this is to be sightly modified as " When there was 4 grade structure the promotions were continious. If a person appointed as CM- II, generally he retires as JWM after gaining 3 promotions with atmost dissatisfaction as his future is in dark in the absence of promotional prospects for JWM. Now one CM has to satisfy with one promotion in his life time to JWM. Where as IOFS and IEs  cadre are assured with 4 or more promotions in total service"
 
as publishing with  point simply retires will not bring the real hurdles  faced by JWM cadre.

Sunday, June 3, 2012

cadre review Annexture

Proposed Upgradation/improvisation in existing grade structure of Group-B(NG/G) Cadre in OFB Organisation

TECHNICAL
NT/(OTS)
NT(STORES)
PROPSOED
GRADE PAY
EXISTING
PROPOSED
%
RP
EXISTING
PROPOSED
%
RP
EXISTING
PROPOSED
%
RP


CM

CM Gr.A
40
3



CM/OS
(NT/(OTS)
Jr. Office Superintendent
40
3


CM
(NT/ST)
Jr. Store Holder
40
3
4600(PB-2)
CM Gr.B

30

4
Sr.  Office Superintendent
(New post)

30

4
Sr. Store Holder
(new post)

30

4
4800 (PB-2)


JWM
JWM Gr.A
20

5


JWM
JWM Gr.A
20

5


JWM
JWM Gr.A

5
5400  (PB-2) *
JWM Gr.B
10



JWM Gr.B
10



JWM Gr.B
10



6600 (PB-3) **
    (HOS)


Notes :-
1)      Existing Two Tier system may be restructured in Four Tier Structure as proposed above in view of better functional as well as promotional aspects in Group-B(NG/G) Cadre.

2)      #:-MCM are already given GP:4200. Hence,GP:4600 for CM(JE/JOS/JSH) is justified in view of their higher responsibilities/workload and entry qualification(Diploma/Graduation) as compared to MCM .

3)      $:- This new Post may be created with GP 4800/- to avoid stagnation in CM and smooth functioning of office/workshop due to sharing of workload/responsibilities between two supervisory cadres

4)      *:- Newly promoted/recruited JWM (redesignated as JWM Gr.A with GP:-5400(PB-2)

5)      **:- This new post i.e. JWM Gr.B (GP:6600 in PB-3) may be created to avoid functional hindrance & stagnation in existing huge strength of JWMs.  Moreover, Foreman(present JWM) were given more pay than newly recruited AWM upto 3rd

OFB - Questioneer

Sub:- Comments on Cadre Review of Gr.-B(NG/G)-reg.

Ref:-(1) No-1318/UA/Vig Dtd:-29/05/2012
       (2) D.O. No-AGM/E&M/CR-Gr.B/BF Dated:-18/05/2012

Respected Sir,
                     With reference to the above, this association wish to bring the  following comments in connection with Cadre Review of Gr.B(NG/G)

(i)   Whether the recommendation of 6th CPC and its implementation by the Govt. to bring the grade structure in the Group-B(NG/G) cadre to two tier in place of erstwhile four grade structure in Ordnance Factories presently, caters to the functional requirement of any improvement in structure/hierarchy .

Comments:-

              No. It has created a negative impact on the whole production units under OFB as under.

  (a)  When there was 4 grade structure ,an absolute pyramid structure was maintained, thereby a distinction between seniors and juniors were well recognised. The orders were effective in right direction vis CM II -> CM I -> AF-> JWM . Now due to reduction from 4 grades to 2 grades this channals were totally disturbed . This resulted same status to both JWM of 10 year service and the  JWM of 35 year service. This has brought down the morality and dedication of the senior JWM/HOS on whom most of the responsibility and contribution lies.

  (b)   The new situation was created as JWM to report JWM which diluted the authority of the cadre.

©     Again this situation forced managements to detail gazetted status JWMs to work at par with CMs  &  MCMs    


(d)    Supervisory responsibilities of existing CM has violently increased due to abolition of the post of CM-I/AF/FM/SH.



                               -2-                          
(e)  Productivity level of CM/JWM has deteriorated due to lower pay package as compared to monthly pay packet of IEs who are working in same shop floor.

(ii)   There is any difficulty in the deployment of Chargemans & JWMs

     Comments:   Yes

(a)   Previously group of Chargeman –II were under the control of  one CM-I, which means single CM-I has controlled many processes/buildings under him. Now no such controls were found which  adversely  affects  the required supervision in production lines.
(b)   Previously  JWMs were deployd only for managerial/Officers/HOS duties because of their experience and abilities gained during their long service. Due to removal of AF cadre, the  JWMs are required and being detailed for supervisory work at par with CM and MCM . In this process JWMs are loosing their morality and unable to contribute their best towards Organisation and on the otherside organisation loosing the utilisation of their talents.  
.

(iii)   Whether Career progression of the incumbents of existing two tiers will be affected adversely by the present set-up and distribution of posts .Suggestions if any for rearrangements so that Careers related aspirations of the incumbents can addressed appropriately.

Comments:-

       Yes the career progression has been terribly affected.

(a)   When there was 4 grade structure the promotions were continious. If a person appointed as CM- II, generally he retires as JWM after gaining 3 promotions. Now one CM has to satisfy with one promotion in his life time to JWM. Where as IOFS and IEs  cadre are assured with 4 or more promotions in total service.


(b)     Though the grades were reduced, no future promotional avenues were planned. The present sanctioned posts in NG cadre (both T & NT ) are as under.

                 AWM –  375
                 JWM -  7694
                   CM – 12085

           For 7694 JWMs only 188 posts of AWM are available ( other 188 posts -50% comes through UPSC as DR ). So there must be unmanagable statgnation at JWM level and resulted detrimental effect on CM’s promotions.




(vi)    Whether there is need of making the cadre with more grades for proper distribution and finalisation of work smoothly .If so, how the grades may be created.


Comments:-Yes, more grades are required as past.

(a)  The NDNGS Association made all side effort from submitting representations to stage Dharna at New Delhi to maintain the 4 grade structure for the betterment of the organisation and the cadre, pointed out the future
                                            -3-
implications. But the same was ignored by the authorities. Now our apprensions are comes true. There is total break down of functions at all levels of factory shop floors. General Managers are well aware of the situation and facing lot of problems on day-to-day production activities.

(b)  The proposed Cadre Review is enclosed as  Annex.A
           
(v)   Is there any apprehension about stagnation in any grade in future and if so, possible remedies can be suggested.

Comments: Yes, existing trend (two tier structure) will result in severe stagnation in CM as well as JWM Cadre. The anticipated position is explained in para(iii)  and remedial measures at para (iv) (b) ,so as to  avoid such stagnation.

    (vi)   The impact of any change in the existing structure on the cost of    
            supervision and productivity

Comments:   Nil Impact

For the last 20 years (after 4th  &  5th CPC)  4 grade structure in ordnance factories was successful and there was no compliant either from employer or employees.  The condensation of 4 grades to 2 grades has created the all round problems starting from production to welfare. Revival of 4 grade structure as proposed herewith, will put back the present derailment in a correct track for effective supervision  and  total productivity.

 
          Submitted for kind perusal & necessary onward action please.

           With  regards

     Encl:-Annexure-A                                     

                                                                      Prepared by
                                                                     


Sunday, May 20, 2012

BOFORS GUNS

Gujarat Global News Network, Kolkata
The Ordnance Factory Board (OFB) is poised to bridge the near 25-year void of the Indian Army's requirement of artillery guns.
"Today OFB is in a position to offer not only the Bofors gun but even the upgraded version of Bofors gun," Director General Ordnance Factory (DGOF) and Chairman OFB, Shri Sashi Dhar Dimri said on the sidelines of the 210th anniversary of OFB in Kolkata, on Monday.
OFB is readying the upgraded version of Bofors gun from its original 39-calibre to a 45-calibre gun, with mechanical and electronic suite upgrades, for field trials by January 2013.
"We are working on this upgraded version. This has been tried out in PXE (Proof and Experimental Establishment), Balasore." he stated. Extensive firing has been carried out at PXE Balasore as part of the internal evaluation.
"Based on the guns supplied by the army, ab-initio we shall be manufacturing the gun and we are confident that in the beginning of 2013, our GCF (Gun Carriage Factory), Jabalpur will be in a position to field the gun for trial purposes," he said.
While one gun has been upgraded with the electronic suite incorporating ballistic computers, servo valves and communication systems to provide automation, the second gun has been upgraded by fitting a new 45 calibre long barrel, enabling it to achieve a range of 40 kms.
Meanwhile, in a written statement in the Parliament on Monday, Defence Minister Shri AK Antony stated: The government had secured the right of transfer of technology during the purchase of Bofors guns. Though all the technological documents as per the ToT contract were received by OFB from M/s AB Bofors, the Transfer of Technology was not carried forward as the dealings with the technology provider, (M/s AB Bofors) were suspended. Further, no indent was placed by Army on OFB for manufacture and supply of complete gun system.
Capital expenditure of Rs. 376.55 crore has been sanctioned by the Government in March, 2012 for creation/augmentation of Large Calibre Weapon manufacturing capacity in Ordnance Factories.



Thursday, May 17, 2012



Parliamentary Panel Confirms Lack of Critical Equipment and Military Preparedness







The Defence Ministry’s insensitivity towards the requirements of the Indian Army has been once again exposed as the Parliamentary Standing Committee on Defence revealed the bleak state of India’s military preparedness. In the report tabled in the Parliament, the committee has strongly recommended immediate attention on the issue of shortage of armaments with the Army at various fronts.
 
The Parliamentary Standing Committee’s report only corroborates the Army Chief’s concern which was the lack of army-aviation, tank ammunition and artillery for the army. Despite the Defence Minister trashing all reports concerning critical shortages in the army as rumours and the Annual Defence Report 2011-12 painting a bright picture of the Indian Army and its capabilities, the cat is finally out of the bag.
 
The Committee’s report has indicated that there are huge gaps between the sanctioned and existing aircraft with the Army Aviation. As per the report, the Indian Army is short of 155 helicopters. As for the existing Cheetah/Chetak helicopters which are used for maintenance at high-altitude forward bases, these are also reaching obsolescence and need replacement. However, no new choppers are in sight for the army as the tender for 197 helicopters was scrapped in 2007 and the new tender is about to meet the same fate. The report stated that there is shortage of 18 Cheetah, 1 Chetak, 76 Advance Light Helicopter (ALH) and 60 Advance Light Helicopter (Weapons Systems Integrated) with Army Aviation.
 
Regarding the issue of tank ammunition and artillery, the committee has agreed with the Indian Army Chief’s contention and the critical shortage in this area. Following the blacklisting of the Israeli Military Industries (IMI), the problem has become magnified. There has been major depletion in the Indian Army’s armored piercing tank ammunition following the blacklisting of the Israeli Firm IMI. The army was relying on IMI for its ammunition after the state-run Ordnance Factory Board’s ammunition failed to pass the trials.
 

The Committee has also remarked on the issue of artillery guns stating that the up gradation of the Bofors 155mm guns has taken a long time and several years have passed after the transfer of technology.  The Committee was appalled to see such a deficiency of gun systems in the army and how the military preparedness is being compromised in the country. Currently, OFB has been handed over the project.
 
While three new defense deals pertaining to sub-machine guns, thermal imagers and target designators for the Indian Army have been signed to boost the surveillance and firepower capabilities, these deals are barely significant compared to the mega deals for the Air Force and the Navy. Hence, fast-tracking of procurements for the Indian Army must be top priority, the report added.
Top
  CAG raps MoD for reckless spending
Ajay Banerjee
Tribune News Service

New Delhi, August 8
The Comptroller and Auditor General (CAG) has ripped apart the Ministry of Defence for recklessly spending crores of rupees and impacting operational preparedness of the forces.

The CAG report on Army, Ordnance factories and DRDO tabled in Parliament yesterday said that the MoD purchased vintage, non-working missiles, allowed setting up of a gun-making unit that does not manufacture guns and even “maintained” products that do not exist in the inventory.
“…the Ministry does not appear to be serious about implications… of defective equipment,” the CAG report said. Pointing out the lackadaisical attitude of the Defence Public Sector Undertakings established to provide the Armed Forces with state-of-the-art equipment, the CAG says there has been a “role reversal”.
The Ministry procured outdated missiles of 1970s worth Rs 587 crore in 2008 merely to favour Bharat Dynamics Limited. “…The missiles procured were not only of lower capabilities in terms of range, but also did not meet the Army’s long-term objective of acquiring third generation missiles which were available in the market,” the Comptroller and Auditor General said.
The CAG also commented on procurement of the Multi Barrel Rocket Launcher System (SMERCH), often proudly displayed at the Republic Day parade. The Rs 2633 crore system has critical defects. Similarly, the Ordnance Factory at Korwa in Amethi was sanctioned Rs 408 crore to produce new generation carbines -- guns with rapid firing capability -- for the Army. However, the type of carbine to be produced is yet to be decided.
Unexplainably, the Army paid for the maintenance of Unmanned Aerial Vehicles that which were not even held by it. In another case, it procured spares for a particular gun and later found those to be non-compatible and hence could not be fitted in the gun.
The CAG also pointed out at defective ammunition worth Rs 245 crore lying unused for six years. Another typical case of defective purchase was procurement of oxygen mask-embedded helmets used by chopper pilots operating at altitudes of beyond 14,000 feet. The oxygen masks had to be withdrawn as pilots experienced serious defects like insufficient supply of oxygen. The masks were purchased with an evaluation.
Appallingly, assault boats required urgently by the Army could not be procured for over six years despite a budget and adequate number of vendors. 
1. ORDNANCE FACTORIES
Unstarred 4876
26/4/2010

(a) the quantum of defence production made by the ordnance factories vis-à-vis the defence requirements;

(b) whether the Government proposes to modernise and expand the ordnance factories;

(c) if so, the details thereof including the plan, if any, to utilize the acquired land in Badmal ordnance factory for expansion;

(d) the funds earmarked, allocated and spent on the modernisation programme separately and the future action plan to achieve the required level of indigenisation of defence systems;

(e) whether the Government proposes to set up new ordnance factories in this regard; and

(f) if so, the details thereof?
ANSWER

MINISTER OF STATE IN THE MINISTRY OF DEFENSE (SHRI M.M. PALLAM RAJU)

(a) The quantum of defence production made by Ordnance

Factories for last three years is given below:

Year Value of Issues(Rs. in crores)
2007-2008 5757
2008-2009 6083
2009-2010 8720
(b) Ordnance Factories are being modernised continuously to keep pace with development of technology. Army & MHA have recently indicated long term requirements, which are substantially higher than the present production level. As such, OFB has undertaken action to augment the capacity wherever required.

(c) & (d):The planned investment for modernisation of Plant & Machinery in Ordnance Factories in 11th & 12th Plan and cumulative expenditure upto January 2010 are furnished as under:
Investment Plan for expenditure modernization Plan (Rupees in Crore) Planned Expenditure during XIth 2010 during XI th Plan (Rupees in crore) Cumulative expenditure Upto January Plan (Rupees in crore) Planned during XIIth
  1,707.50 970.24 2,100
At present, no expansion is planned at OF Badmal.

(e) & (f): At present, there is no proposal to set up a new ordnance factory.
2. REVIEW OF PERFOMANCE OF ORDNANCE FACTORIES:
Unstarred Question 2061
20/7/2009

(a) Whether the Government has reviewed the performance of ordnance factories in the country;

(b) If so, the details thereof;

(c) The targets set and achievements made by each ordnance factory, including the ordnance factory at Saintala, Bolangir during the last three years; and

(d) The steps taken to increase the production capacity of the factories?
ANSWER
MINISTER OF THE STATE IN THE MINISTRY OF DEFENCE (SHRI M.M. PALLAM RAJU)

(a) & (b): Yes, Sir. The performance of Ordnance Factories is regularly reviewed by the Ordnance Factory Board (OFB) and the Ministry of Defence at various levels.A production review meeting is held by OFB once in two months in which the performance of ordnance factories is reviewed in detail.The overall performance is reviewed by the Ministry of Defence at various levels.There are also steering committees at the Ministry’s level and working groups at the OFB level for reviewing the progress of major projects such as MBT Arjun, Ordnance Factory, Nalanda, Ordnance Factory, Korwa and the Pinaka Rocket Project.

(c) The factory-wise targets and achievements for the last 3 years including Ordnance Factory, Bolangir are detailed in the Annexure.

(d) Ordnance Factory Board has recently worked out production capacity of Ordnance Factories based on long term requirement of ammunitions and armoured vehicles projected by Indian Army.Action has been taken to augment capacity for production by positioning plant and machinery and manpower to meet the requirement.
http://164.100.47.132/Annexture/lsq15/2/au2061.htm
3. UNUSED LAND IN DEFENCE PRODUCTION UNITS
Unstarred Question 1247
13/7/2009

(a)whether large acreages of lands are lying unused in various Defence production units in the country;

(b) if so, the details thereof, including the unused lands in the ordnance factory at Saintala in Orissa;

(c) Whether any action plan has been formulated to utilize the surplus lands; and

(d) if not, the steps taken to surrender the surplus lands for other developmental purposes?
ANSWER

MINISTER OF STATE IN THE (SHRI M.M. PALLAM RAJU) MINISTRY OF DEFENCE

(a) No, Sir.

(b to (d) Do not arise.